Unmatched Waterproofing:TIG welding technology achieves IP65-rated sealing, eliminating common leakage issues
Industrial 4.0 Precision:Laser-guided welding (±0.5mm) with triple-coat system passing 2400hrs salt spray test
Rapid Deployment:Patent locking system enables 200㎡ assembly within 72 hours by trained crews
Extreme Durability:Galvanized steel-basalt composite walls maintain 15+ years lifespan in -40℃~80℃ environments
Eco-Friendly:100% recyclable wall materials reduce construction waste by 70%
Modular Flexibility:Horizontal/vertical expansion capabilities meet diverse space requirements
Smart Ready:Pre-installed conduit system supports smart home integration

Flat pack building can be designed to engineering camp, military camp, resettlement house, schools, mining camp, commercial house(coffee, hall), tourism occupancy house (beach, grassland) and so on.


1. Bottom frame feet | 2. Bottom frame secondary beam (C-shaped steel) | 3. Bottom frame long side beam (5635mm) |
4. Cement fiber board (19mm) | 5. 2mm PVC Carpet | 6. Column trim (2600mm) |
7. Prism (2535mm) | 8. Plastic steel windows + anti-theft net | 9. Ceiling plate V-830 profiled steel plate |
10. Class A fireproof glass wool | 11. Skin panel (0.45mm) | 12. Top frame secondary beam |
13. Top frame long side beam (5635mm) | 14. Top frame feet | 15. Top frame short side beam (2690mm) |
16. Top tie beam square tube | 17. Top frame long side beam (5635mm) | 18. Prism (2535mm) |
19. Drain pipe | 20. Wall panel (75mm) | 21. PVC baseboard |
22. Bottom tie beam square tube | 23. Bottom frame short side (2690mm) |
INSTALLTION

PACKING & LOADING
![]() | ![]() | ![]() |
|
|